Mikano Generator Installation Service Nigeria — Links Energies

₦350,000

Professional Mikano generator installation
service across Nigeria. Includes concrete
base, electrical connection, automatic
changeover switch, and commissioning.
From ₦350,000. WhatsApp 07061425382.

Category: Brand:

Professional Mikano generator installation
service in Nigeria from Links Energies Ltd
(RC: 9474133). Complete turnkey installation
for brand new Mikano generators across
all 36 states. Add this service to your
generator order and Links Energies handles
everything from delivery to commissioning.

WHAT IS INCLUDED
Electrical connection from generator to
your facility distribution board including
all necessary cabling and conduit.

Automatic changeover switch supply and
installation — switches automatically
between NEPA and generator power without
manual intervention.

Earth bonding and earthing system
installation to manufacturer standards
and Nigerian electrical safety codes.

Full test run and commissioning after
installation to verify all systems are
operating correctly at rated capacity.

Operator training for your facility
manager or designated operator — how
to start, stop, check oil, check coolant,
and perform basic maintenance checks.

INSTALLATION PRICING
20KVA to 40KVA: ₦350,000
50KVA to 100KVA: ₦500,000
Above 100KVA: Quote on inspection

Final price depends on your location,
facility type, and installation complexity.
WhatsApp 07061425382 for a site assessment
and accurate installation quote.

HOW TO ADD INSTALLATION TO YOUR ORDER
Step 1 — Order your generator first
Step 2 — Add this installation service
to your cart alongside the generator
Step 3 — Our team contacts you to
assess your site and confirm
the installation price
Step 4 — Installation scheduled on
or after delivery day

WHY USE LINKS ENERGIES INSTALLATION
Using the same company for supply and
installation ensures your warranty
remains valid. Mikano manufacturer
warranty requires commissioning by
an authorised representative.

DIY installation or using an unqualified
engineer risks voiding your 5 year
manufacturer warranty on the generator.

Links Energies installation engineers
are experienced with Mikano generators
and follow manufacturer commissioning
procedures exactly.

ALSO AVAILABLE
Changeover switch only supply and
installation — from ₦80,000 depending
on capacity.

Exhaust extension pipe with rain cap —
from ₦45,000 for proper exhaust
management at your facility.

First year maintenance package —
from ₦150,000 including 50 hour
first service and 250 hour full service.

WhatsApp 07061425382 to discuss
any of these additional services.

WHY LINKS ENERGIES
CAC registered — RC: 9474133
Professional installation across Nigeria.
Manufacturer approved commissioning.
Warranty protection guaranteed.

WhatsApp: 07061425382
linksenergies.com
Office: 8a Sanyaolu Street
Off Kudirat Abiola Way
Ikeja, Lagos
RC: 9474133

Reviews

There are no reviews yet.

Be the first to review “Mikano Generator Installation Service Nigeria — Links Energies”

Your email address will not be published. Required fields are marked *

Scroll to Top